
Add to Cart
2mm Upright for Rack and Shelf Roll Forming Machine – By Gear Box
A. Machine Detailed Parameters
1 | Machine structure | Wire-electrode cutting |
2 | Main power | 18.5KW |
3 | Roller stations | About 18 stations with torque head |
4 | Productivity | 5-7m/min including punching time |
5 | Drive system | By gear box |
6 | Diameter of shaft | ¢70mm solid shaft |
7 | Voltage | 380V 50Hz 3phases (Customized) |
8 | Container need | 1x40GP + 1x20GP container |
B. Profile Drawing
No | Specification of the material | |
1 | Suitable Material | CR,HR |
2 | Width of the raw material | Based on the profile |
3 | Thickness | 2.0mm |
C. The Chart of Process Flow
Un-coiler—Leveling —Servo feeding & Punching—Roll Forming—Cutting—out table
D. Specification of Components
No | Item | Technical Specification & Remark |
1 | 5T Hydraulic Un-coiler |
|
2 | Leveling part |
|
3 | Servo Feeding & Punching |
|
4 | Main Roll Forming Machine |
|
5 | Machine structure: |
|
6 | Hydraulic cutting system |
|
7 | Hydraulic System |
|
8 | Computer Control Cabinet |
|
9 | Out table |
|
10 | Spare Parts |
|
Machine photo for reference:
FAQ
1) Q: Will you deliver the right goods as ordered? How can I trust you?
A: Yes, we will. We are Gold supplier of Made-in-China with SGS assessment (Audit report can be provided). We have cooperated with many customers all over the world with high market reputation, no worries.
2) Q: How to choose the Tube Mill Line?
A: You have to inform us following details:
- The pipe material
- Round pipe range
- Square pipe range
- Rectangle pipe range
- Wall thickness range
- The pipe usage
3) Q: How to choose the Roll Forming Machine?
A: You have to inform us following details:
- Coil material
- Coil thickness
- Coil weight
- Cutting type
- Profiles drawings
- Other special attention
4) Q: How to choose the Slitting Line & Cut to Length line?
A: You have to inform us following details:
- Coil material
- Coil thickness
- Coil width
- Coil weight
- Finished sizes
- Other special attention
55) Q: Where is the nearest airport to your company?
A: Shanghai Putong or Hongqiao Airport.
6) Q: How about your service?
A: Before sales:
- Technical Support: TGMCO will provide detailed technical information such as technical & commercial offer, machine photos, running video, layout, operation manual, and show you working machines in our factory.
- Apply Visa: TGMCO will provide officially invitation letter to apply Visa in china embassy as authority procedures and requirements.
After sales: TGMCO provides comprehensive After Sales Support and Service to meet our customer need.
- Drawings: Provide the foundation drawing, electric scheme and wiring diagram, hydraulic drawing, pneumatic & electric pipeline drawing and other drawings requested by customer.
- Installation and commissioning: TGMCO will send our technicians to customer's workshop for supervision of installation and commission
Training of Customers' technician/workers during commission
- Breakdown Support: We offer 1 year warranty service for main crucial components except consumables
Inform immediate technical assistance and advice to customer by phone or e-mail.
Skilled and experienced engineers are capable of dealing with any type of breakdowns.
Technical service work performed in Customer's site if required.
Urgently supply mechanical or electronic components.
Fast supply of spare parts and wearing parts to cover foreseeable requirements
Packing & Delivery